Projects

Bruce Webb Dam pre liner

Bruce Webb Dam

Seddon

This vineyard water storage pond was tendered for and successfully secured following the completion of significant earthworks for Pukaka Limited.

Read more
Moletta Installing Concrete blocks with wire rope

Moleta Gravel Extraction & Rockwall Stage II

Marlborough

The existing stopbank protecting the Moleta Vineyard was two-thirds eroded prior to works commencing. If this bank were eroded entirely, the river would flood, damage and erode the adjacent vineyard.

Read more