Moletta Installing Concrete blocks with wire rope

Moleta Gravel Extraction & Rockwall Stage II

Marlborough

The existing stopbank protecting the Moleta Vineyard was two-thirds eroded prior to works commencing. If this bank were eroded entirely, the river would flood, damage and erode the adjacent vineyard.

Read more
Bruce Webb Dam pre liner

Bruce Webb Dam

Seddon

This vineyard water storage pond was tendered for and successfully secured following the completion of significant earthworks for Pukaka Limited.

Read more
Gabion to reduce speed

Marfells Stream

Marlborough

To protect the grapes lining Marfells Stream; this project required earthworks along the bank of the stream, the installation of gabion baskets to reduce water speed and scouring, and the construction of five culvert crossings to enable efficient transport of vineyard machinery.