Projects

The final surface was topped off with over 12000 T of free draining chip ready for the rubbish

Bluegums Landfill Stage 8 Development

Bluegums Landfill, Blenheim

The Marlborough District Council engaged Simcox (the Blenheim based division of Isaac Construction) to complete the development of the next stage of the Bluegums Landfill in Blenheim.

Read more
Waikawa Marina 004

Waikawa Marina Extension Reclamation Works

Waikawa Marina, Picton

Waikawa Marina Extension Reclamation Works for Port Marlborough

Read more
Birch Hill 001

Birch Hill Vineyard Development

Birch Hill Vineyard Development for Delegat Limited

Read more
Waikawa Road Shoulder Upgrade 001

Waikawa Road Shoulder Upgrade

The Waikawa Road Shoulder Upgrade project involved earthworks, installation of services (mainly stormwater), the preparation and pouring of concrete kerb and footpaths and roading with chip seal for Waka Kotahi New Zealand Transport Agency

Read more
Nikau Subdivision 001

Construction of Roads and Services for Nikau Subdivision – Stage 1A

Marlborough

Construction of Roads and Services for Nikau Subdivision Stage 1A for Robinson Construction Limited

Read more
Renwick AC Water Replacements 006

Renwick AC Water Replacements (West)

Renwick

Renwick AC Water Replacements (West) for Marlborough District Council

Read more
Picture 7 Omaka Landing Subdivision

Omaka Landing Subdivision

Blenheim

Colonial Vineyard Limited decided to subdivide their farming land to 5 commercial and 250 residential lots.

Read more
Park Terrace Stopbank Finished Article all hydroseeded resized

Park Terrace Stopbank

Marlborough

The Park Terrace Stopbank project was the last of the earthquake damage projects in the Marlborough District Council budget. Due to time constraints Marlborough District Council need a contractor to finish the works within a 6 month window over summer before any potential winter flooding occurred.

Read more
Moletta Installing Concrete blocks with wire rope

Moleta Gravel Extraction & Rockwall Stage II

Marlborough

The existing stopbank protecting the Moleta Vineyard was two-thirds eroded prior to works commencing. If this bank were eroded entirely, the river would flood, damage and erode the adjacent vineyard.

Read more