Project overview

Location Bluegums Landfill, Blenheim

Scope $3.2M

Date of completion May 2021

The Marlborough District Council engaged Simcox (the Blenheim based division of Isaac Construction) to complete the development of the next stage of the Bluegums Landfill in Blenheim.

The final surface was topped off with over 12000 T of free draining chip ready for the rubbish

Overview:

The Marlborough District Council engaged Simcox (the Blenheim based division of Isaac Construction) to complete the development of the next stage of the Bluegums Landfill in Blenheim. The project involved the excavation and placement of over 80,000m3 of rock. The majority of the excavation was completed via ripping with a bulldozer and 48T digger and then carting away with dump trucks. We also completed our own drilling and blasting in the lower layers when the rock got particularly hard. As we were working in an active landfill, we had to manage the haul roads and access points so as not to interfere with the normal landfill traffic.

We also completed all of the associated impermeable clay capping, lining, sediment ponds, leachate drains, gas lines and surface drains for this project.

Gallery